Menu

P91 and P22 Pipe Bending for Petrochemical Plants

High chrome alloys run hot and under pressure. Bend them badly and you lose the creep strength you bought them for.

We induction bend high chrome materials including ASTM A335 P11, P22 and P91 for petrochemical and power plant pipework.

Post-bend heat treatment is available through a locally based facility, and our UKAS accredited lab can confirm properties after bending.

Proper process control on materials that need it.

More Products

  • 3D Radius Pipe Bends for Oil and Gas Pipelines

  • Pipeline Bends for Onshore Gas Terminals UK

  • Duplex 22Cr Pipe Bending Service UK

  • Bevelled Pipe Bends Ready to Weld for Oil and Gas