Menu

Submarine Hose Pressure Surge Protection

Submarine Hose Pressure Surge Protection is an important consideration for CBM submerged hose lines. Gall Thomson provides application guidance on marine transfer protection, with an emphasis on addressing damaging transient pressure events. The correct solution depends on the terminal arrangement, the hose construction, the transferred medium and the operational risks.

For buoy mooring systems, the choice of valve, design parting load and closure speed depends on factors including flow rate, transferred liquid, hose construction, flushing and pigging requirements.

For more information about CBM submerged hose lines, read the Gall Thomson application guidance and contact the technical team to discuss the installation.

ENQUIRY FORM

More Products

  • Floating Storage Unit Transfer Safety

  • Floating Storage Offloading Hose Safety

  • Offshore Terminal Floating Hose Systems

  • Single Point Mooring Hose Protection