Menu

Post Activation Hose Isolation Procedures

Post Activation Hose Isolation Procedures is an important consideration for activated hose strings. Gall Thomson provides application guidance on marine transfer protection, with an emphasis on planning a compatible hose sealing arrangement. The correct solution depends on the terminal arrangement, the hose construction, the transferred medium and the operational risks.

Keeping the correct spool available at or near the marine transfer site can provide greater flexibility during incident recovery. Operators should follow the applicable technical and safety procedures.

For more information about activated hose strings, read the Gall Thomson application guidance and contact the technical team to discuss the installation.

ENQUIRY FORM

More Products

  • Floating Storage Unit Transfer Safety

  • Floating Storage Offloading Hose Safety

  • Offshore Terminal Floating Hose Systems

  • Single Point Mooring Hose Protection