Menu

MBM Mooring Failure Risk Reduction

MBM Mooring Failure Risk Reduction is an important consideration for MBM mooring failures. Gall Thomson provides application guidance on marine transfer protection, with an emphasis on considering hose protection where vessel position changes. The correct solution depends on the terminal arrangement, the hose construction, the transferred medium and the operational risks.

The typical CBM installation places a coupling near the pipeline end manifold, although the final design depends on the PLEM, hose sequence, medium and operating conditions. Each separate transfer string needs appropriate consideration.

For more information about MBM mooring failures, read the Gall Thomson application guidance and contact the technical team to discuss the installation.

Visit the Gall Thomson Environmental Ltd website for more information on MBM Mooring Failure Risk Reduction

ENQUIRY FORM

More Products

  • Floating Storage Unit Transfer Safety

  • Floating Storage Offloading Hose Safety

  • Offshore Terminal Floating Hose Systems

  • Single Point Mooring Hose Protection