Menu

Marine Coupling Activation Recovery Planning

Marine Coupling Activation Recovery Planning is an important consideration for activated marine breakaway couplings. Gall Thomson provides application guidance on marine transfer protection, with an emphasis on preparing practical post-activation hose management options. The correct solution depends on the terminal arrangement, the hose construction, the transferred medium and the operational risks.

A Flushing Adaptor Spool adapts the MBC break face to a standard ASME flange connection and provides additional options for managing hoses after activation. The chosen procedure depends on the situation and equipment involved.

For more information about activated marine breakaway couplings, read the Gall Thomson application guidance and contact the technical team to discuss the installation.

ENQUIRY FORM

More Products

  • Floating Storage Unit Transfer Safety

  • Floating Storage Offloading Hose Safety

  • Offshore Terminal Floating Hose Systems

  • Single Point Mooring Hose Protection