CBM Terminal Downtime Risk Reduction
CBM Terminal Downtime Risk Reduction is an important consideration for CBM transfer operations. Gall Thomson provides application guidance on marine transfer protection, with an emphasis on reducing potential disruption after an incident. The correct solution depends on the terminal arrangement, the hose construction, the transferred medium and the operational risks.
The typical CBM installation places a coupling near the pipeline end manifold, although the final design depends on the PLEM, hose sequence, medium and operating conditions. Each separate transfer string needs appropriate consideration.
For more information about CBM transfer operations, read the Gall Thomson application guidance and contact the technical team to discuss the installation.
Visit the Gall Thomson Environmental Ltd website for more information on CBM Terminal Downtime Risk Reduction